PROJECT MANAGEMENT SERVICES

Healthcare construction is expensive. Costly mistakes? Even more so. For 35+ years, RMS’s medical division, MCG, has helped healthcare owners save millions by protecting capital, cutting through complexity, and getting facilities open and generating revenue. One team. Total accountability. No excuses!

Single facilities · Active renovations · Multi-site programs

Owner-side leaders reviewing plans in a healthcare lobby under construction

Site and program decisions, made with the owner in the room

Owner-side team reviewing plans, schedule, and material selections across a decision table

Cost, schedule, and material decisions on one record

Completed clinic environment operating as a repeatable prototype

Operational readiness on opening day

We protect your pockets.

Architects, contractors, and vendors each protect their own scope. The owner is the only party carrying the full risk exposure — and usually the only party without a full-time professional managing it.

ContextThe design grows between milestones: an extra procedure room, an upgraded imaging suite, a finish package nobody priced.

ExposureSix figures of scope enter the drawings before the estimate catches up, and by then the cheap reversal is gone.

DecisionMCG prices each addition against the operating plan and brings the owner one comparison, with the deadline to decide.

Owner outcomeScope grows only where it earns its cost, and the budget still means something at bid.

ContextLandlord allowance, lender draw schedule, equipment financing, and the construction contract each assume a different calendar.

ExposureCash is committed before the conditions that release it are met, or work stops waiting on a draw.

DecisionMCG aligns the funding structure with the procurement and construction sequence before signing contracts.

Owner outcomeCapital arrives when the project needs it, not when the paperwork catches up.

ContextLicensing, inspections, equipment delivery, staff training, and the first scheduled appointment all land in the same sixty days.

ExposureA finished building sits empty, carrying rent and payroll, waiting on an inspection nobody sequenced.

DecisionMCG builds the activation calendar backward from the first patient and holds every party to it.

Owner outcomeThe doors open on the date the pro forma assumed.

Owner-side team reviewing plans, schedule, and material selections across a decision table

Plan, schedule, cost exposure, and material decisions reviewed as one record — the working method behind every MCG engagement.

MARKET STATS

$75.8 billion

$8.52 trillion healthcare market in 2026

U.S. healthcare construction spending sits at a seasonally adjusted annual rate of roughly $75.8 billion

15% to 20% Loss

Real estate capital structured

Budget Overruns: Healthcare projects frequently experience average cost increases of 15% to 20% when proper management controls are absent, squeezing institutional capital.

$430 to $470

Documented project savings

Average Costs: The national average for standard two- to three-story hospital facilities ranges from $430 to $470 per square foot. 

One owner-side system, read by the priority you carry.

Select a stage to see what MCG controls for capital, operations, and risk — and the decision the owner is asked to make.

Stage

Capital

Operations

Risk

Decision

Site

Rent, TI allowance, and total occupancy cost modeled before signature.

Test fits against the clinical program and patient flow.

Zoning, licensing path, base-building power and structure.

Sign, negotiate, or walk.

Program

Order-of-magnitude budget with named contingency logic.

Room-by-room program signed by the people who will use it.

Assumptions tested against the pro forma before design starts.

Confirm the project definition.

Design

Independent cost checks tied to each design milestone.

Workflow, equipment, and staffing are reviewed at every phase.

Constructability and long-lead items identified early.

Approve the set, or price the alternative.

Build

Pay applications verified against installed work.

Phasing that protects revenue-producing space.

Change orders tested against contract entitlement.

Accept, contest, or reprice each change.

Activate

Final retention released only against a closed punch list.

Equipment, training, and move-in sequenced to first appointment.

Licensing and inspection calendar owned, not assumed.

Declare the facility ready to open.

Featured engagement — active-facility renovation

Meet our CEO

Leadership

With over 35 years of experience, Russ McDaniel leads RMSPM’s owner’s representation and construction project management services, protecting client investments from planning through completion.

Industry Experience

His expertise spans healthcare facilities, luxury hospitality, entertainment, commercial development, and complex renovation projects across public and private sectors.

Core Expertise

Russ specializes in development strategy, construction oversight, cost control, value engineering, design-build coordination, and capital project delivery.

Outcome

Protect the owner’s capital. Anticipate problems. Control costs. Accelerate delivery. Turn complex projects into successful investments.

Russ Mcdaniel
Completed clinic environment operating as a repeatable prototype

Multi-site programs

One prototype becomes a program you can repeat.

Standards for layout, patient flow, equipment, finishes, and vendor scope are set once, priced once, and carried into every following site — so site twelve opens the way site one did, with a shorter calendar.

Prototype

One facility designed, priced, and built as the standard the program will repeat.

Playbook

Layout, equipment, finishes, and vendor scope are documented so nothing is renegotiated per site.

Pipeline

Site selection and lease terms are evaluated against the prototype, not case by case.

Cadence

Openings scheduled as a program, with one team reporting across every site in motion.

OPEN

Where is your project losing control?

Tell us about your project. A senior member of our team reads your project before the first call and responds within one business day.

01

You share your project details

Company, contact details, and the type of project you are planning.

02

We read the project first

A senior team member reviews your stage against comparable engagements before any call.

03

You get a written read

Where the risk sits, what we would control, and whether we are the right party — within one business day.

Prefer to talk first? (844) 494-1300